SBM / CABGOC

2 CALM BUOYS

SBM / CABGOC

Today, Paenal has a successful record in the development of proven self-elevating platform projects that gained strong acceptance in the market, despite the high level of difficulty falling on the specialized team. Because these projects require Drilling System Layout, Geotechnical Performance Predictions, Next-generation jack-up design and self-installing platform.

In construction of 2x Shallow Water CALM Buoys for the MTOE Project, Paenal take focus on his layout design to facilitate the transfer of product between floating production facilities and tankers. In these case, the buoys have a different funtional design.

  • Construction of 2 shallow water calm buoys for the MTOE Project;

  • 500 metric tons;

  • Delivered in Q2 2009.